Busbar Installation
Busbar Installation
New build high rise building comprising of 31 floors – Busbar Installation project for installing the 4000A – 2500A Cast Resin Landlord Interlink Busbar systems between switchboards on all plant levels, All vertical rising busbar systems and Tap offs between required floors.
We worked hard with the manufacturers, site team and main contractors to produce detailed lifting plans and full site M&E Service coordination against the model where required, Also ensuring, Ambient temperatures, Correct site conditions and Health and Safety was maintained at all times to project completion.