West London Data Centre

Critical Data Centre Switchgear Upgrade

This project was to undertake the replacement of the existing 4000A Main LV Switchboards and Submains 800A to 400A LV switchboards which predominantly serve the mechanical services at a Data Centre in London. The works were undertaken in a phased manner such that normal operation of the existing data halls and functionality of the Building Control and Management spaces was maintained at all times.